Production

Batch Details

Opal Oasis

Quoted

BATCH-00004

Apr 26, 2026

Total Items

2

2 units total

Production Cost

MVR 9339.93

Total Revenue

MVR 12141.91

Total Profit

MVR 2801.98

Profit Margin

23.1%

Production Items

Item Quantity Production Cost/Unit Selling Price/Unit Total Cost Total Revenue Profit
Opal Oasis
1 units MVR 1650.41 MVR 2145.53 MVR 1650.41 MVR 2145.53 MVR 495.12
Opal Oasis Channel
1 units MVR 7689.53 MVR 9996.38 MVR 7689.53 MVR 9996.38 MVR 2306.85
Totals: MVR 9339.93 MVR 12141.91 MVR 2801.98

Material Requirements

Based on available packaging
Material Required Quantity Package Size Packages Needed Cost/Package Total Package Cost
3mm Acrylic White (Transparent)
Area
432.00 pcs
1.00 pcs/pack
1.00 pcs
432 packages MVR 1135.00 MVR 490320.00
Acrylic Spray Paint [Bosny]
Count/Pieces
5.00 pcs
1.00 pcs/pack
1.00 pcs
5 packages MVR 65.00 MVR 325.00
LED Strip
Length
312.00 in
1.00 in/pack
1.00 in
312 packages MVR 0.50 MVR 156.00
MMLA Outdoor
Weight
1000.00 g
1000.00 g/pack
1000.00 g
1 package MVR 1000.00 MVR 1000.00
Acrylic 1.8mm [white]
Area
642.00 sqin
1.00 sqin/pack
1.00 sqin
642 packages MVR 700.00 MVR 449400.00
Total Material Package Cost: MVR 941201.00

Package Calculation Note:

Material requirements are calculated based on available package sizes. For example, if a project requires 1.5 units and the material comes in packs of 1 unit each, you'll need to purchase 2 packages.

Labour Requirements

Labour Type Total Hours Hourly Rate Total Cost
Designer
24.00 hrs MVR 125.00/hr MVR 3000.00

Machine Requirements

Machine Task Type Total Hours Hourly Rate Total Cost
Laser Cutter
6mm acrylic cut 0.22 hrs MVR 35.00/hr MVR 7.58
3D Printer
shell 0.20 hrs MVR 350.00/hr MVR 70.00