Production

Production Item Details

Biosphere Inn Main Sign

Standard Batch: 1.00 units

Cost per Unit

MVR 1,522.70

Batch Cost (1.00 units)

MVR 1,522.70

Material Cost

$422.80

Labour Cost

$250.00

Machine Cost

$849.90

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
600.000 sqin per unit
Batch (1.00 units): 600.00 sqin
1 package(s) needed
$0.2496/sqin
$1150.00/package
$149.74/unit Batch: $1150.00
ABS Mirror Acrylic [Dovira]
Area Package: 1.00 sqmm
576.000 sqmm per unit
Batch (1.00 units): 576.00 sqmm
1 package(s) needed
$0.0053/sqmm
$395.37/package
$3.07/unit Batch: $395.37
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$65.0000/pcs
$65.00/package
$130.00/unit Batch: $130.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$20.0000/pcs
$20.00/package
$40.00/unit Batch: $40.00
Shipping
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$10.0000/pcs
$10.00/package
$100.00/unit Batch: $100.00
Total Material Cost: $422.80

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 120.00 min $125.00/hr $250.00
Total Labour Cost: $250.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 30.00 min $13.33/min $399.90
laser cut 3mm Laser Cutter laser cut 3mm 15.00 min $30.00/min $450.00
Total Machine Cost: $849.90