Production

Production Item Details

Rinbidhoo school

Standard Batch: 1.00 units

Cost per Unit

MVR 1,029.56

Batch Cost (1.00 units)

MVR 1,029.56

Material Cost

$504.56

Labour Cost

$0.00

Machine Cost

$525.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
1000.000 sqin per unit
Batch (1.00 units): 1000.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$504.56/unit Batch: $2325.00
Total Material Cost: $504.56

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 15.00 min $35.00/min $525.00
Total Machine Cost: $525.00