Production

Production Item Details

Rinbudhoo School Signage

Standard Batch: 1.00 units

Cost per Unit

MVR 4,415.00

Batch Cost (1.00 units)

MVR 4,415.00

Material Cost

$1750.00

Labour Cost

$1000.00

Machine Cost

$1665.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm [white]
Area Package: 1.00 sqin
1536.000 sqin per unit
Batch (1.00 units): 1536.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$800.00/unit Batch: $2400.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
576.000 sqin per unit
Batch (1.00 units): 576.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$300.00/unit Batch: $2400.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$65.0000/pcs
$65.00/package
$650.00/unit Batch: $650.00
Total Material Cost: $1750.00

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 45.00 min $35.00/min $1575.00
SQIN UV SQIN 18.00 min $5.00/min $90.00
Total Machine Cost: $1665.00