Production

Production Item Details

neillaidhoo council - man of the match

Standard Batch: 1.00 units

Cost per Unit

MVR 459.11

Batch Cost (1.00 units)

MVR 459.11

Material Cost

$134.11

Labour Cost

$125.00

Machine Cost

$200.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
14.000 sqin per unit
Batch (1.00 units): 14.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$7.06/unit Batch: $2325.00
ABS Mirror Acrylic [Dovira]
Area Package: 1.00 sqmm
12600.000 sqmm per unit
Batch (1.00 units): 12600.00 sqmm
1 package(s) needed
$0.0053/sqmm
$395.37/package
$67.05/unit Batch: $395.37
Custom Wooden Trophy Base (M)
Count/Pieces Package: 1.00 pcs
3.000 pcs per unit
Batch (1.00 units): 3.00 pcs
3 package(s) needed
$20.0000/pcs
$20.00/package
$60.00/unit Batch: $60.00
Total Material Cost: $134.11

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 5.00 min $35.00/min $175.00
SQIN UV SQIN 5.00 min $5.00/min $25.00
Total Machine Cost: $200.00