Production

Production Item Details

Beachbond

Standard Batch: 1.00 units

Cost per Unit

MVR 422.29

Batch Cost (1.00 units)

MVR 422.29

Material Cost

$222.34

Labour Cost

$0.00

Machine Cost

$199.95

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
370.000 sqin per unit
Batch (1.00 units): 370.00 sqin
1 package(s) needed
$0.2496/sqin
$1150.00/package
$92.34/unit Batch: $1150.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$65.0000/pcs
$65.00/package
$130.00/unit Batch: $130.00
Total Material Cost: $222.34

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 15.00 min $13.33/min $199.95
Total Machine Cost: $199.95