Kudakudhinge Park

Standard Batch: 1.00 units

Cost per Unit

MVR 1,512.40

Batch Cost (1.00 units)

MVR 1,512.40

Material Cost

$612.50

Labour Cost

$500.00

Machine Cost

$399.90

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
1152.000 sqin per unit
Batch (1.00 units): 1152.00 sqin
1 package(s) needed
$0.2496/sqin
$1150.00/package
$287.50/unit Batch: $1150.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
5.000 pcs per unit
Batch (1.00 units): 5.00 pcs
5 package(s) needed
$65.0000/pcs
$65.00/package
$325.00/unit Batch: $325.00
Total Material Cost: $612.50

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 30.00 min $13.33/min $399.90
Total Machine Cost: $399.90