Production

Production Item Details

sabadi project

Standard Batch: 1.00 units

Cost per Unit

MVR 303.33

Batch Cost (1.00 units)

MVR 303.33

Material Cost

$40.83

Labour Cost

$62.50

Machine Cost

$200.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
80.000 sqin per unit
Batch (1.00 units): 80.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$20.83/unit Batch: $1200.00
Custom Wooden Trophy Base (M)
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$20.0000/pcs
$20.00/package
$20.00/unit Batch: $20.00
Total Material Cost: $40.83

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 30.00 min $125.00/hr $62.50
Total Labour Cost: $62.50

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 5.00 min $30.00/min $150.00
SQIN UV SQIN 10.00 min $5.00/min $50.00
Total Machine Cost: $200.00