Production

Production Item Details

nellaidhoo football/ handball trophy

Standard Batch: 1.00 units

Cost per Unit

MVR 927.30

Batch Cost (1.00 units)

MVR 927.30

Material Cost

$127.30

Labour Cost

$125.00

Machine Cost

$675.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
54.000 sqin per unit
Batch (1.00 units): 54.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$27.25/unit Batch: $2325.00
ABS Mirror Acrylic [Dovira]
Area Package: 1.00 sqmm
11.000 sqmm per unit
Batch (1.00 units): 11.00 sqmm
1 package(s) needed
$0.0053/sqmm
$395.37/package
$0.06/unit Batch: $395.37
Custom Wooden Trophy Base (M)
Count/Pieces Package: 1.00 pcs
5.000 pcs per unit
Batch (1.00 units): 5.00 pcs
5 package(s) needed
$20.0000/pcs
$20.00/package
$100.00/unit Batch: $100.00
Total Material Cost: $127.30

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 15.00 min $35.00/min $525.00
laser cut 3mm Laser Cutter laser cut 3mm 5.00 min $30.00/min $150.00
Total Machine Cost: $675.00