Production

Production Item Details

aahiya

Standard Batch: 1.00 units

Cost per Unit

MVR 1,222.50

Batch Cost (1.00 units)

MVR 1,222.50

Material Cost

$322.50

Labour Cost

$0.00

Machine Cost

$900.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Mirror Acrylic [Dovira]
Area Package: 1.00 sqin
1152.000 sqin per unit
Batch (1.00 units): 1152.00 sqin
1 package(s) needed
$0.2799/sqin
$1290.00/package
$322.50/unit Batch: $1290.00
Total Material Cost: $322.50

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 30.00 min $30.00/min $900.00
Total Machine Cost: $900.00