Production

Production Item Details

gondi

Standard Batch: 1.00 units

Cost per Unit

MVR 294.24

Batch Cost (1.00 units)

MVR 294.24

Material Cost

$35.94

Labour Cost

$125.00

Machine Cost

$133.30

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
9mm pineboard (fingerjoint)
Area Package: 1.00 sqin
196.000 sqin per unit
Batch (1.00 units): 196.00 sqin
1 package(s) needed
$0.1834/sqin
$845.00/package
$35.94/unit Batch: $845.00
Total Material Cost: $35.94

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 10.00 min $13.33/min $133.30
Total Machine Cost: $133.30