Production

Production Item Details

Vakkaru Corel Tree

Standard Batch: 1.00 units

Cost per Unit

MVR 13,698.10

Batch Cost (1.00 units)

MVR 13,698.10

Material Cost

$5600.00

Labour Cost

$500.00

Machine Cost

$7598.10

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
18432.000 sqin per unit
Batch (1.00 units): 18432.00 sqin
4 package(s) needed
$0.2496/sqin
$1150.00/package
$4600.00/unit Batch: $4600.00
Shipping
Count/Pieces Package: 1.00 pcs
100.000 pcs per unit
Batch (1.00 units): 100.00 pcs
100 package(s) needed
$10.0000/pcs
$10.00/package
$1000.00/unit Batch: $1000.00
Total Material Cost: $5600.00

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 570.00 min $13.33/min $7598.10
Total Machine Cost: $7598.10