Production

Production Item Details

class room no signage

Standard Batch: 1.00 units

Cost per Unit

MVR 121.85

Batch Cost (1.00 units)

MVR 121.85

Material Cost

$11.85

Labour Cost

$0.00

Machine Cost

$110.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic [Clear]
Area Package: 1.00 pcs
60.000 pcs per unit
Batch (1.00 units): 60.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$11.85/unit Batch: $910.00
Total Material Cost: $11.85

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Spot UV Spot 1.00 min $50.00/min $50.00
laser cut 3mm Laser Cutter laser cut 3mm 2.00 min $30.00/min $60.00
Total Machine Cost: $110.00