Production

Production Item Details

Banyantree

Standard Batch: 1.00 units

Cost per Unit

MVR 5.70

Batch Cost (1.00 units)

MVR 5.70

Material Cost

$5.70

Labour Cost

$0.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
9.000 sqin per unit
Batch (1.00 units): 9.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$2.34/unit Batch: $1200.00
Mirror Acrylic [Dovira]
Area Package: 1.00 sqin
12.000 sqin per unit
Batch (1.00 units): 12.00 sqin
1 package(s) needed
$0.2799/sqin
$1290.00/package
$3.36/unit Batch: $1290.00
Total Material Cost: $5.70

Labour Operations

No labour operations added yet

Machine Operations

No machine operations added yet