Production

Production Item Details

Bunny

Standard Batch: 1.00 units

Cost per Unit

MVR 51.49

Batch Cost (1.00 units)

MVR 51.49

Material Cost

$1.49

Labour Cost

$0.00

Machine Cost

$50.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Plywood 3mm (Malay)
Area Package: 1.00 sqin
16.000 sqin per unit
Batch (1.00 units): 16.00 sqin
1 package(s) needed
$0.0933/sqin
$430.00/package
$1.49/unit Batch: $430.00
Total Material Cost: $1.49

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Spot UV Spot 1.00 min $50.00/min $50.00
Total Machine Cost: $50.00