Production

Production Item Details

Naiboli

Standard Batch: 1.00 units

Cost per Unit

MVR 442.18

Batch Cost (1.00 units)

MVR 442.18

Material Cost

$22.18

Labour Cost

$0.00

Machine Cost

$420.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
28.000 sqin per unit
Batch (1.00 units): 28.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$14.13/unit Batch: $2325.00
3mm Acrylic [Clear]
Area Package: 1.00 pcs
28.000 pcs per unit
Batch (1.00 units): 28.00 pcs
1 package(s) needed
$0.1975/pcs
$910.00/package
$5.53/unit Batch: $910.00
Mirror Acrylic [Dovira]
Area Package: 1.00 sqin
9.000 sqin per unit
Batch (1.00 units): 9.00 sqin
1 package(s) needed
$0.2799/sqin
$1290.00/package
$2.52/unit Batch: $1290.00
Total Material Cost: $22.18

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 2.00 min $35.00/min $70.00
laser cut 3mm Laser Cutter laser cut 3mm 10.00 min $30.00/min $300.00
Spot UV Spot 1.00 min $50.00/min $50.00
Total Machine Cost: $420.00