Baleylaa

Standard Batch: 1.00 units

Cost per Unit

MVR 3,956.18

Batch Cost (1.00 units)

MVR 3,956.18

Material Cost

$2156.38

Labour Cost

$1000.00

Machine Cost

$799.80

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
1428.000 sqin per unit
Batch (1.00 units): 1428.00 sqin
1 package(s) needed
$0.2496/sqin
$1150.00/package
$356.38/unit Batch: $1150.00
PVC Board [12mm]
Area Package: 1.00 sqin
9216.000 sqin per unit
Batch (1.00 units): 9216.00 sqin
2 package(s) needed
$0.1953/sqin
$900.00/package
$1800.00/unit Batch: $1800.00
Total Material Cost: $2156.38

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 60.00 min $13.33/min $799.80
Total Machine Cost: $799.80