feydhoo - lantern

Standard Batch: 1.00 units

Cost per Unit

MVR 1,032.28

Batch Cost (1.00 units)

MVR 1,032.28

Material Cost

$382.28

Labour Cost

$125.00

Machine Cost

$525.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
500.000 sqin per unit
Batch (1.00 units): 500.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$252.28/unit Batch: $2325.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$65.0000/pcs
$65.00/package
$130.00/unit Batch: $130.00
Total Material Cost: $382.28

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 15.00 min $35.00/min $525.00
Total Machine Cost: $525.00