Production

Production Item Details

Fanriya

Standard Batch: 1.00 units

Cost per Unit

MVR 2,464.56

Batch Cost (1.00 units)

MVR 2,464.56

Material Cost

$1439.56

Labour Cost

$500.00

Machine Cost

$525.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
2376.000 pcs per unit
Batch (1.00 units): 2376.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$585.23/unit Batch: $1135.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
792.000 sqin per unit
Batch (1.00 units): 792.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$412.50/unit Batch: $2400.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
2.000 pcs per unit
Batch (1.00 units): 2.00 pcs
2 package(s) needed
$65.0000/pcs
$65.00/package
$130.00/unit Batch: $130.00
Shipping
Count/Pieces Package: 1.00 pcs
30.000 pcs per unit
Batch (1.00 units): 30.00 pcs
30 package(s) needed
$10.0000/pcs
$10.00/package
$300.00/unit Batch: $300.00
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
48.000 pcs per unit
Batch (1.00 units): 48.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$11.82/unit Batch: $1135.00
Total Material Cost: $1439.56

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 15.00 min $35.00/min $525.00
Total Machine Cost: $525.00