Production

Production Item Details

baraabaru fc stensil

Standard Batch: 1.00 units

Cost per Unit

MVR 725.00

Batch Cost (1.00 units)

MVR 725.00

Material Cost

$600.00

Labour Cost

$125.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
2304.000 sqin per unit
Batch (1.00 units): 2304.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$600.00/unit Batch: $1200.00
Total Material Cost: $600.00

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

No machine operations added yet