Production

Production Item Details

feydhoo - quran award

Standard Batch: 1.00 units

Cost per Unit

MVR 8,374.38

Batch Cost (1.00 units)

MVR 8,374.38

Material Cost

$2699.38

Labour Cost

$375.00

Machine Cost

$5300.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
PVC Board [18mm]
Area Package: 1.00 sqin
920.000 sqin per unit
Batch (1.00 units): 920.00 sqin
1 package(s) needed
$0.2496/sqin
$1150.00/package
$229.60/unit Batch: $1150.00
Acrylic 6mm
Area Package: 1.00 sqin
920.000 sqin per unit
Batch (1.00 units): 920.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$464.19/unit Batch: $2325.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
1936.000 sqin per unit
Batch (1.00 units): 1936.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$1008.33/unit Batch: $2400.00
ABS Mirror Acrylic [Dovira]
Area Package: 1.00 sqmm
187404.000 sqmm per unit
Batch (1.00 units): 187404.00 sqmm
3 package(s) needed
$0.0053/sqmm
$395.37/package
$997.25/unit Batch: $1186.11
Total Material Cost: $2699.38

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 180.00 min $125.00/hr $375.00
Total Labour Cost: $375.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
A4 UV A4 30.00 min $130.00/min $3900.00
6mm acrylic cut Laser Cutter 6mm acrylic cut 40.00 min $35.00/min $1400.00
Total Machine Cost: $5300.00