Production

Production Item Details

KFC Tsunami

Standard Batch: 1.00 units

Cost per Unit

MVR 433.75

Batch Cost (1.00 units)

MVR 433.75

Material Cost

$318.75

Labour Cost

$0.00

Machine Cost

$115.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm [white]
Area Package: 1.00 sqin
612.000 sqin per unit
Batch (1.00 units): 612.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$318.75/unit Batch: $2400.00
Total Material Cost: $318.75

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
SQIN UV SQIN 23.00 min $5.00/min $115.00
Total Machine Cost: $115.00