Production

Production Item Details

the standard qr stand

Standard Batch: 1.00 units

Cost per Unit

MVR 112.14

Batch Cost (1.00 units)

MVR 112.14

Material Cost

$2.14

Labour Cost

$0.00

Machine Cost

$110.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Nayatho
Area Package: 1.00 sqin
24.000 sqin per unit
Batch (1.00 units): 24.00 sqin
1 package(s) needed
$0.0890/sqin
$410.00/package
$2.14/unit Batch: $410.00
Total Material Cost: $2.14

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 2.00 min $30.00/min $60.00
Spot UV Spot 1.00 min $50.00/min $50.00
Total Machine Cost: $110.00