Production

Production Item Details

Standard Beach Grill

Standard Batch: 1.00 units

Cost per Unit

MVR 920.83

Batch Cost (1.00 units)

MVR 920.83

Material Cost

$570.83

Labour Cost

$0.00

Machine Cost

$350.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
18mm pineboard (fingerjoint)
Area Package: 1.00 sqin
1152.000 sqin per unit
Batch (1.00 units): 1152.00 sqin
1 package(s) needed
$0.3147/sqin
$1450.00/package
$362.50/unit Batch: $1450.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
400.000 sqin per unit
Batch (1.00 units): 400.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$208.33/unit Batch: $2400.00
Total Material Cost: $570.83

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 10.00 min $35.00/min $350.00
Total Machine Cost: $350.00