Production

Production Item Details

Kandi X2

Standard Batch: 1.00 units

Cost per Unit

MVR 114.06

Batch Cost (1.00 units)

MVR 114.06

Material Cost

$39.06

Labour Cost

$0.00

Machine Cost

$75.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
100.000 sqin per unit
Batch (1.00 units): 100.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$26.04/unit Batch: $1200.00
Acrylic 3mm (black)
Area Package: 1.00 sqin
50.000 sqin per unit
Batch (1.00 units): 50.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$13.02/unit Batch: $1200.00
Total Material Cost: $39.06

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 2.50 min $30.00/min $75.00
Total Machine Cost: $75.00