Production

Production Item Details

wamco

Standard Batch: 1.00 units

Cost per Unit

MVR 2,173.83

Batch Cost (1.00 units)

MVR 2,173.83

Material Cost

$423.83

Labour Cost

$0.00

Machine Cost

$1750.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic [clear] 12mm
Area Package: 1.00 sqin
558.000 sqin per unit
Batch (1.00 units): 558.00 sqin
1 package(s) needed
$0.7595/sqin
$3500.00/package
$423.83/unit Batch: $3500.00
Total Material Cost: $423.83

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Laser Cut 12mm Laser Cutter Laser Cut 12mm 35.00 min $50.00/min $1750.00
Total Machine Cost: $1750.00