Production

Production Item Details

kandi council reception

Standard Batch: 1.00 units

Cost per Unit

MVR 832.23

Batch Cost (1.00 units)

MVR 832.23

Material Cost

$782.23

Labour Cost

$0.00

Machine Cost

$50.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
6mm pineboard (fingerjoint)
Area Package: 1.00 pcs
240.000 pcs per unit
Batch (1.00 units): 240.00 pcs
1 package(s) needed
$0.1400/pcs
$645.00/package
$33.59/unit Batch: $645.00
Acrylic 6mm
Area Package: 1.00 sqin
121.000 sqin per unit
Batch (1.00 units): 121.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$61.05/unit Batch: $2325.00
Acrylic 6mm
Area Package: 1.00 sqin
238.000 sqin per unit
Batch (1.00 units): 238.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$120.08/unit Batch: $2325.00
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
2304.000 pcs per unit
Batch (1.00 units): 2304.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$567.50/unit Batch: $1135.00
Total Material Cost: $782.23

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Spot UV Spot 1.00 min $50.00/min $50.00
Total Machine Cost: $50.00