pearlbay

Standard Batch: 1.00 units

Cost per Unit

MVR 462.17

Batch Cost (1.00 units)

MVR 462.17

Material Cost

$462.17

Labour Cost

$0.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
516.000 sqin per unit
Batch (1.00 units): 516.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$260.35/unit Batch: $2325.00
Acrylic 6mm
Area Package: 1.00 sqin
400.000 sqin per unit
Batch (1.00 units): 400.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$201.82/unit Batch: $2325.00
Total Material Cost: $462.17

Labour Operations

No labour operations added yet

Machine Operations

No machine operations added yet