Production

Production Item Details

Wedding Heart Center Piece

Standard Batch: 1.00 units

Cost per Unit

MVR 1,453.39

Batch Cost (1.00 units)

MVR 1,453.39

Material Cost

$53.39

Labour Cost

$500.00

Machine Cost

$900.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Plywood (Normal) 3mm
Area Package: 1.00 sqin
1200.000 sqin per unit
Batch (1.00 units): 1200.00 sqin
1 package(s) needed
$0.0445/sqin
$205.00/package
$53.39/unit Batch: $205.00
Total Material Cost: $53.39

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 30.00 min $30.00/min $900.00
Total Machine Cost: $900.00