Production

Production Item Details

Graduation frame

Standard Batch: 1.00 units

Cost per Unit

MVR 330.73

Batch Cost (1.00 units)

MVR 330.73

Material Cost

$17.40

Labour Cost

$0.00

Machine Cost

$313.33

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Nayatho
Area Package: 1.00 sqin
96.000 sqin per unit
Batch (1.00 units): 96.00 sqin
1 package(s) needed
$0.0890/sqin
$410.00/package
$8.54/unit Batch: $410.00
Acrylic 1.5mm [clear]
Area Package: 1.00 sqin
48.000 sqin per unit
Batch (1.00 units): 48.00 sqin
1 package(s) needed
$0.1845/sqin
$850.00/package
$8.85/unit Batch: $850.00
Total Material Cost: $17.40

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Cutting CNC Cutting 1.00 min $13.33/min $13.33
laser cut 3mm Laser Cutter laser cut 3mm 10.00 min $30.00/min $300.00
Total Machine Cost: $313.33