Production

Production Item Details

nouvelle hedhika token

Standard Batch: 1.00 units

Cost per Unit

MVR 21.04

Batch Cost (1.00 units)

MVR 21.04

Material Cost

$1.04

Labour Cost

$0.00

Machine Cost

$20.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
4.000 sqin per unit
Batch (1.00 units): 4.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$1.04/unit Batch: $1200.00
Total Material Cost: $1.04

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
SQIN UV SQIN 4.00 min $5.00/min $20.00
Total Machine Cost: $20.00