Production

Production Item Details

Thundi Takeaway

Standard Batch: 1.00 units

Cost per Unit

MVR 204.80

Batch Cost (1.00 units)

MVR 204.80

Material Cost

$79.80

Labour Cost

$125.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
324.000 pcs per unit
Batch (1.00 units): 324.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$79.80/unit Batch: $1135.00
Total Material Cost: $79.80

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

No machine operations added yet