Standard Batch: 1.00 units

Cost per Unit

MVR 285.17

Batch Cost (1.00 units)

MVR 285.17

Material Cost

$72.67

Labour Cost

$62.50

Machine Cost

$150.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
18.000 sqin per unit
Batch (1.00 units): 18.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$4.69/unit Batch: $1200.00
Acrylic 1.8mm [white]
Area Package: 1.00 sqin
2.250 sqin per unit
Batch (1.00 units): 2.25 sqin
1 package(s) needed
$0.1519/sqin
$700.00/package
$0.34/unit Batch: $700.00
18mm pineboard (fingerjoint)
Area Package: 1.00 sqin
8.400 sqin per unit
Batch (1.00 units): 8.40 sqin
1 package(s) needed
$0.3147/sqin
$1450.00/package
$2.64/unit Batch: $1450.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$65.00/unit Batch: $65.00
Total Material Cost: $72.67

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 30.00 min $125.00/hr $62.50
Total Labour Cost: $62.50

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 5.00 min $30.00/min $150.00
Total Machine Cost: $150.00