Production

Production Item Details

Coral Stone Haven

Standard Batch: 1.00 units

Cost per Unit

MVR 4,514.72

Batch Cost (1.00 units)

MVR 4,514.72

Material Cost

$139.72

Labour Cost

$125.00

Machine Cost

$4250.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
18mm pineboard (fingerjoint)
Area Package: 1.00 sqin
432.000 sqin per unit
Batch (1.00 units): 432.00 sqin
1 package(s) needed
$0.3147/sqin
$1450.00/package
$135.94/unit Batch: $1450.00
6mm pineboard (fingerjoint)
Area Package: 1.00 pcs
27.000 pcs per unit
Batch (1.00 units): 27.00 pcs
1 package(s) needed
$0.1400/pcs
$645.00/package
$3.78/unit Batch: $645.00
Total Material Cost: $139.72

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 60.00 min $125.00/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Laser Engraving Normal Laser Cutter Laser Engraving Normal 60.00 min $50.00/min $3000.00
room numbers engrave & cut Laser Cutter Laser Engraving Normal 15.00 min $50.00/min $750.00
Room key tags Laser Cutter Laser Engraving Normal 10.00 min $50.00/min $500.00
Total Machine Cost: $4250.00