Production

Production Item Details

Kary

Standard Batch: 1.00 units

Cost per Unit

MVR 350.62

Batch Cost (1.00 units)

MVR 350.62

Material Cost

$350.63

Labour Cost

$0.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm sunboard
Area Package: 1.00 sqft
13.200 sqft per unit
Batch (1.00 units): 13.20 sqft
1 package(s) needed
$26.5625/sqft
$850.00/package
$350.63/unit Batch: $850.00
Total Material Cost: $350.63

Labour Operations

No labour operations added yet

Machine Operations

No machine operations added yet