Production

Production Item Details

Lo Medal

Standard Batch: 1.00 units

Cost per Unit

MVR 325.00

Batch Cost (1.00 units)

MVR 325.00

Material Cost

$50.00

Labour Cost

$125.00

Machine Cost

$150.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm sunboard
Area Package: 1.00 sqft
2.000 sqft per unit
Batch (1.00 units): 2.00 sqft
1 package(s) needed
$25.0000/sqft
$800.00/package
$50.00/unit Batch: $800.00
Total Material Cost: $50.00

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 120.00 min $62.50/hr $125.00
Total Labour Cost: $125.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
Laser Engraving Normal Laser Cutter Laser Engraving Normal 3.00 min $50.00/min $150.00
Total Machine Cost: $150.00