Production

Production Item Details

Mirror Acrylic Tropphy

Standard Batch: 1.00 units

Cost per Unit

MVR 372.43

Batch Cost (1.00 units)

MVR 372.43

Material Cost

$9.93

Labour Cost

$62.50

Machine Cost

$300.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
38.000 sqin per unit
Batch (1.00 units): 38.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$9.90/unit Batch: $1200.00
Mirror Acrylic [Red Creatic]
Area Package: 1.00 sqin
38.000 sqin per unit
Batch (1.00 units): 38.00 sqin
1 package(s) needed
$0.0008/sqin
$750.00/package
$0.03/unit Batch: $750.00
Total Material Cost: $9.93

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 30.00 min $125.00/hr $62.50
Total Labour Cost: $62.50

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 10.00 min $30.00/min $300.00
Total Machine Cost: $300.00