Production

Production Item Details

Nineteen

Standard Batch: 1.00 units

Cost per Unit

MVR 1,822.29

Batch Cost (1.00 units)

MVR 1,822.29

Material Cost

$372.29

Labour Cost

$1000.00

Machine Cost

$450.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
576.000 pcs per unit
Batch (1.00 units): 576.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$141.88/unit Batch: $1135.00
PVC Board 4mm
Area Package: 1.00 sqin
576.000 sqin per unit
Batch (1.00 units): 576.00 sqin
1 package(s) needed
$0.0933/sqin
$430.00/package
$53.75/unit Batch: $430.00
PVC Board 4mm
Area Package: 1.00 sqin
768.000 sqin per unit
Batch (1.00 units): 768.00 sqin
1 package(s) needed
$0.0933/sqin
$430.00/package
$71.67/unit Batch: $430.00
LED Strip
Length Package: 1.00 in
210.000 in per unit
Batch (1.00 units): 210.00 in
210 package(s) needed
$0.5000/in
$0.50/package
$105.00/unit Batch: $105.00
Total Material Cost: $372.29

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 15.00 min $30.00/min $450.00
Total Machine Cost: $450.00