Production

Production Item Details

Alhey Quran Award

Standard Batch: 1.00 units

Cost per Unit

MVR 606.50

Batch Cost (1.00 units)

MVR 606.50

Material Cost

$56.50

Labour Cost

$250.00

Machine Cost

$300.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Mirror Acrylic [Red Creatic]
Area Package: 1.00 sqin
216.000 sqin per unit
Batch (1.00 units): 216.00 sqin
1 package(s) needed
$0.0008/sqin
$750.00/package
$0.17/unit Batch: $750.00
Custom Wooden Trophy Base (M)
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$20.0000/pcs
$20.00/package
$20.00/unit Batch: $20.00
Acrylic 6mm
Area Package: 1.00 sqin
72.000 sqin per unit
Batch (1.00 units): 72.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$36.33/unit Batch: $2325.00
Total Material Cost: $56.50

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 120.00 min $125.00/hr $250.00
Total Labour Cost: $250.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 10.00 min $30.00/min $300.00
Total Machine Cost: $300.00