Production

Production Item Details

Ananea AMM Signs

Standard Batch: 1.00 units

Cost per Unit

MVR 2,860.31

Batch Cost (1.00 units)

MVR 2,860.31

Material Cost

$235.31

Labour Cost

$375.00

Machine Cost

$2250.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
6mm pineboard (fingerjoint)
Area Package: 1.00 pcs
288.000 pcs per unit
Batch (1.00 units): 288.00 pcs
1 package(s) needed
$0.1400/pcs
$645.00/package
$40.31/unit Batch: $645.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
3.000 pcs per unit
Batch (1.00 units): 3.00 pcs
3 package(s) needed
$65.0000/pcs
$65.00/package
$195.00/unit Batch: $195.00
Total Material Cost: $235.31

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 180.00 min $125.00/hr $375.00
Total Labour Cost: $375.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 75.00 min $30.00/min $2250.00
Total Machine Cost: $2250.00