Production

Production Item Details

Uligan Council Signs

Standard Batch: 1.00 units

Cost per Unit

MVR 3,648.34

Batch Cost (1.00 units)

MVR 3,648.34

Material Cost

$448.34

Labour Cost

$500.00

Machine Cost

$2700.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
ABS Mirror Acrylic [Dovira]
Area Package: 1.00 sqmm
657.000 sqmm per unit
Batch (1.00 units): 657.00 sqmm
1 package(s) needed
$0.0053/sqmm
$395.37/package
$3.50/unit Batch: $395.37
Acrylic 3mm (black)
Area Package: 1.00 sqin
657.000 sqin per unit
Batch (1.00 units): 657.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$171.09/unit Batch: $1200.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$20.0000/pcs
$20.00/package
$200.00/unit Batch: $200.00
Shipping
Count/Pieces Package: 1.00 pcs
3.000 pcs per unit
Batch (1.00 units): 3.00 pcs
3 package(s) needed
$10.0000/pcs
$10.00/package
$30.00/unit Batch: $30.00
Acrylic 3mm (black)
Area Package: 1.00 sqin
168.000 sqin per unit
Batch (1.00 units): 168.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$43.75/unit Batch: $1200.00
Total Material Cost: $448.34

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 75.00 min $30.00/min $2250.00
laser cut 3mm Laser Cutter laser cut 3mm 15.00 min $30.00/min $450.00
Total Machine Cost: $2700.00