Production

Production Item Details

Opal Oasis

Standard Batch: 1.00 units

Cost per Unit

MVR 1,650.41

Batch Cost (1.00 units)

MVR 1,650.41

Material Cost

$195.41

Labour Cost

$1000.00

Machine Cost

$455.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
3mm Acrylic White (Transparent)
Area Package: 1.00 pcs
432.000 pcs per unit
Batch (1.00 units): 432.00 pcs
1 package(s) needed
$0.2463/pcs
$1135.00/package
$106.41/unit Batch: $1135.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$65.00/unit Batch: $65.00
LED Strip
Length Package: 1.00 in
48.000 in per unit
Batch (1.00 units): 48.00 in
48 package(s) needed
$0.5000/in
$0.50/package
$24.00/unit Batch: $24.00
Total Material Cost: $195.41

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 13.00 min $35.00/min $455.00
Total Machine Cost: $455.00