Production

Production Item Details

Opal Oasis Channel

Standard Batch: 1.00 units

Cost per Unit

MVR 7,689.53

Batch Cost (1.00 units)

MVR 7,689.53

Material Cost

$1489.53

Labour Cost

$2000.00

Machine Cost

$4200.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
MMLA Outdoor
Weight Package: 1000.00 g
1000.000 g per unit
Batch (1.00 units): 1000.00 g
1 package(s) needed
$1.0000/g
$1000.00/package
$1000.00/unit Batch: $1000.00
Acrylic 1.8mm [white]
Area Package: 1.00 sqin
642.000 sqin per unit
Batch (1.00 units): 642.00 sqin
1 package(s) needed
$0.1519/sqin
$700.00/package
$97.53/unit Batch: $700.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
4.000 pcs per unit
Batch (1.00 units): 4.00 pcs
4 package(s) needed
$65.0000/pcs
$65.00/package
$260.00/unit Batch: $260.00
LED Strip
Length Package: 1.00 in
264.000 in per unit
Batch (1.00 units): 264.00 in
264 package(s) needed
$0.5000/in
$0.50/package
$132.00/unit Batch: $132.00
Total Material Cost: $1489.53

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 960.00 min $125.00/hr $2000.00
Total Labour Cost: $2000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
shell 3D Printer shell 12.00 min $350.00/min $4200.00
Total Machine Cost: $4200.00