Production

Production Item Details

Makunudhoo WDC

Standard Batch: 1.00 units

Cost per Unit

MVR 370.62

Batch Cost (1.00 units)

MVR 370.62

Material Cost

$40.63

Labour Cost

$0.00

Machine Cost

$330.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 3mm (black)
Area Package: 1.00 sqin
156.000 sqin per unit
Batch (1.00 units): 156.00 sqin
1 package(s) needed
$0.2604/sqin
$1200.00/package
$40.63/unit Batch: $1200.00
Total Material Cost: $40.63

Labour Operations

No labour operations added yet

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 11.00 min $30.00/min $330.00
Total Machine Cost: $330.00