Production

Production Item Details

Veyogandu

Standard Batch: 1.00 units

Cost per Unit

MVR 2,406.25

Batch Cost (1.00 units)

MVR 2,406.25

Material Cost

$581.25

Labour Cost

$250.00

Machine Cost

$1575.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
1152.000 sqin per unit
Batch (1.00 units): 1152.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$581.25/unit Batch: $2325.00
Total Material Cost: $581.25

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 120.00 min $125.00/hr $250.00
Total Labour Cost: $250.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 45.00 min $35.00/min $1575.00
Total Machine Cost: $1575.00