Production

Production Item Details

KFC backpaste

Standard Batch: 1.00 units

Cost per Unit

MVR 762.89

Batch Cost (1.00 units)

MVR 762.89

Material Cost

$762.89

Labour Cost

$0.00

Machine Cost

$0.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
1512.000 sqin per unit
Batch (1.00 units): 1512.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$762.89/unit Batch: $2325.00
Total Material Cost: $762.89

Labour Operations

No labour operations added yet

Machine Operations

No machine operations added yet