Production

Production Item Details

Athiri Inn Signage

Standard Batch: 1.00 units

Cost per Unit

MVR 1,808.95

Batch Cost (1.00 units)

MVR 1,808.95

Material Cost

$233.95

Labour Cost

$375.00

Machine Cost

$1200.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Marine Plywood 6mm (VG)
Area Package: 1.00 sqin
576.000 sqin per unit
Batch (1.00 units): 576.00 sqin
1 package(s) needed
$0.1519/sqin
$700.00/package
$87.50/unit Batch: $700.00
Acrylic 1.8mm [white]
Area Package: 1.00 sqin
207.000 sqin per unit
Batch (1.00 units): 207.00 sqin
1 package(s) needed
$0.1519/sqin
$700.00/package
$31.45/unit Batch: $700.00
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$65.00/unit Batch: $65.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$20.0000/pcs
$20.00/package
$20.00/unit Batch: $20.00
Shipping
Count/Pieces Package: 1.00 pcs
3.000 pcs per unit
Batch (1.00 units): 3.00 pcs
3 package(s) needed
$10.0000/pcs
$10.00/package
$30.00/unit Batch: $30.00
Total Material Cost: $233.95

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 180.00 min $125.00/hr $375.00
Total Labour Cost: $375.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
laser cut 3mm Laser Cutter laser cut 3mm 40.00 min $30.00/min $1200.00
Total Machine Cost: $1200.00