viyavathi sheild

Standard Batch: 15.00 units

Cost per Unit

MVR 4,554.38

Batch Cost (15.00 units)

MVR 68,315.62

Material Cost

$404.38

Labour Cost

$1000.00

Machine Cost

$3150.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm
Area Package: 1.00 sqin
576.000 sqin per unit
Batch (15.00 units): 8640.00 sqin
2 package(s) needed
$0.5046/sqin
$2325.00/package
$290.63/unit Batch: $4650.00
3mm Acrylic [Clear]
Area Package: 1.00 pcs
576.000 pcs per unit
Batch (15.00 units): 8640.00 pcs
2 package(s) needed
$0.1975/pcs
$910.00/package
$113.75/unit Batch: $1820.00
Total Material Cost: $404.38

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 480.00 min $125.00/hr $1000.00
Total Labour Cost: $1000.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 90.00 min $35.00/min $3150.00
Total Machine Cost: $3150.00