Production

Production Item Details

Buttefly Foi gondi

Standard Batch: 1.00 units

Cost per Unit

MVR 1,008.20

Batch Cost (1.00 units)

MVR 1,008.20

Material Cost

$198.20

Labour Cost

$250.00

Machine Cost

$560.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic Spray Paint [Bosny]
Count/Pieces Package: 1.00 pcs
1.000 pcs per unit
Batch (1.00 units): 1.00 pcs
1 package(s) needed
$65.0000/pcs
$65.00/package
$65.00/unit Batch: $65.00
Acrylic 6mm
Area Package: 1.00 sqin
264.000 sqin per unit
Batch (1.00 units): 264.00 sqin
1 package(s) needed
$0.5046/sqin
$2325.00/package
$133.20/unit Batch: $2325.00
Total Material Cost: $198.20

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 120.00 min $125.00/hr $250.00
Total Labour Cost: $250.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 16.00 min $35.00/min $560.00
Total Machine Cost: $560.00