Hilm Academy Sign

Standard Batch: 1.00 units

Cost per Unit

MVR 2,155.21

Batch Cost (1.00 units)

MVR 2,155.21

Material Cost

$955.21

Labour Cost

$500.00

Machine Cost

$700.00

Bill of Materials

Material Qty per Unit Unit Cost Cost/Unit
Acrylic 6mm [white]
Area Package: 1.00 sqin
490.000 sqin per unit
Batch (1.00 units): 490.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$255.21/unit Batch: $2400.00
Acrylic 6mm [white]
Area Package: 1.00 sqin
960.000 sqin per unit
Batch (1.00 units): 960.00 sqin
1 package(s) needed
$0.5208/sqin
$2400.00/package
$500.00/unit Batch: $2400.00
Shipping
Count/Pieces Package: 1.00 pcs
10.000 pcs per unit
Batch (1.00 units): 10.00 pcs
10 package(s) needed
$10.0000/pcs
$10.00/package
$100.00/unit Batch: $100.00
Glue & Tape
Count/Pieces Package: 1.00 pcs
5.000 pcs per unit
Batch (1.00 units): 5.00 pcs
5 package(s) needed
$20.0000/pcs
$20.00/package
$100.00/unit Batch: $100.00
Total Material Cost: $955.21

Labour Operations

Operation Labour Type Time/Unit (min) Hourly Rate Cost/Unit
Designer Designer 240.00 min $125.00/hr $500.00
Total Labour Cost: $500.00

Machine Operations

Operation Machine Task Type Time/Unit (min) Rate/Min Cost/Unit
6mm acrylic cut Laser Cutter 6mm acrylic cut 20.00 min $35.00/min $700.00
Total Machine Cost: $700.00